| A 96 metres long completely assembled underground Tunnel Boring Machine began tunnelling work betwee by Mafia on 12 July, 2013 - 08:00 PM | ||
|---|---|---|
Mafia | A 96 metres long completely assembled underground Tunnel Boring Machine began tunnelling work betwee on 12 July, 2013 - 08:00 PM | |
A 96 metres long completely assembled underground Tunnel Boring Machine began tunnelling work between Jama Masjid and Delhi Gate metro stations today. This is the longest TBM ever used in Delhi Metro | ||