| Infrastructure at rail workshop in Mysore being ramped up by nikhilndls on 25 May, 2013 - 12:00 AM | ||
|---|---|---|
nikhilndls | Infrastructure at rail workshop in Mysore being ramped up on 25 May, 2013 - 12:00 AM | |
The infrastructure at the Central Railway Workshop in Mysore city is being ramped up for undertaking the periodic overhauling and maintenance of Linke Holfmann Busch (LHB) coaches that constitute the rakes of the Shatabdi and the Rajdhani trains.This is part of the capacity building of the railway workshops across the country as the Indian Railways plans to substitute the conventional Integral Coach Factory-designed coaches with the German technology-based LHB coaches for most Indian trains in the long run.“The Mysore workshop has been upgraded to handle the LHB coaches and 29 such coaches have been overhauled here since October 2012. The workshop’s installed capacity at present is to take up maintenance of eight LHB coaches a month or 96 coaches a year. This is in addition to the periodic overhauling and maintenance of 70 ICF-designed coaches a month, of which 10 will be AC coaches. The workshop also takes up intermediate overhauling of 40 coaches a month,” Mr. U. Subba Rao, chief workshop manager, said.Though the LHB coaches are expensive (One LHB coach costs about Rs. 1.8 crore while an for an ICF coach costs Rs. 65 lakh), they are found to be more efficient and capable of higher speeds ranging from 160 kmph to 200 kmph and reckoned to be safer while providing greater ride comfort. | ||