| UT ill-equipped to measure structures on Metro Rail route by Mafia on 08 April, 2013 - 08:00 PM | ||
|---|---|---|
Mafia | UT ill-equipped to measure structures on Metro Rail route on 08 April, 2013 - 08:00 PM | |
The survey of the UT engineering department to identify residential and institutional structures falling in the proposed Metro Rail route and which required to be demolished, has nosedived even before takeoff, in want of equipment required for the work. According to sources, a team of officials was formed and assigned the said work, but it flatly refused to carry out the survey for taking the said measurements with gadgets such as measuring tape and demanded that they needed electrical tools for correct measurements.The responsibility of carrying out the survey was given to a team headed by a sub-divisional engineer. In the first week of March, the team was directed to complete the survey and submit details after physical inspection of the same in a prescribed time frame of one-week.The officials are now planning to take assistance of the Delhi Metro Rail Corporation (DMRC) for carrying out the survey.UT chief engineer SK Chadha was not available for comments despite repeated attempts. | ||